Category: Charter school serving grades K - 12
Client: York Prep Academy
1047 Gold Gate Court
Rock Hill, SC 29732

York Preparatory Academy in Rock Hill, SC was one of the first newly built charter schools in the state of South Carolina. The project was worked on for two years from the site selection, rezoning, annexation, and finally construction and completion.

The project was planned in two phases. Phase 1 was completed in 2012 and includes grades K-10 in three building on a 45 acre campus. Phase 2 of York Preparatory Academy began in December of 2012 and was completed in August 2013 for grades 9 – 12. Upon completion, the school campus will be built out to accommodate 1,650 students in four buildings with a total of 175,000 SF.

  • Institutional grade pre-cast exterior concrete panels.
  • Commercial grade storefront aluminum exterior windows and doors.
  • Chemistry, biology and earth sciences lab.
  • Phase 1 included 3 buildings accommodating students in grades K-10.
  • Solid surface cultured marble bathroom countertops.
  • 2 x 2 ceiling tile.
  • Open atrium.
  • School wide wireless PA system.
  • Acoustical wall panels in gym.
  • Plumbing fixtures per code requirements.
  • 6 – mechanical basketball goals.
  • Fully sprinkled fire protection.
  • Fire Alarm system.
  • "Mach 1" wood gym flooring with custom lettering and logo.