About The School
Hubrich Construction began construction on the new two story 69,000 sq. ft. building in August of 2022. The project had an 8 month construction duration from building pad to turnover and serves K - 8 students at Faith Academy Charter Schools as it expands to serve a full range of K - 12 grade levels.
- 69,000 Square Feet.
- 26 acre abandoned quarry site.
- Tilt-up concrete panels and metal frame.
- Fully sprinklered building.
- 40+ classrooms.
- Machineroom-less elevator.
- Administrative offices.
- Library, lab rooms and art rooms.
- PE locker rooms.
- Exterior includes 180+ parking spaces.
- TPO membrane roofing.
- Landscaping.
- Playing field in a wooded setting.
- Blasted over 20,000 tons of granite.
- Installed 4'x10' box culvert in wetlands.