About The School
Hubrich Contacting began construction of the new Horse Creek Academy buildings in May 2020 and are expected to be completed for the 2021 - 2022 school year. The building will serve students in expanded grade levels and offer the South Carolina high school diploma track as well as South Carolina credential track and have career-centered experiences on campus beginning with agriculture.
- Upgrade one existing building.
- New construction of 2 additional buildings:
- Building A is 26,276 square feet.
- Building B is 27.348 square feet.
- Wood framed with Architectural timber rafters.
- Exterior will be Hardie-panel 5/16” siding with 8” x 4” trim to match existing campus.
- Flooring is Luxury Vinyl Plank throughout.
- Two common areas with vaulted ceilings and cupola for student cafeteria and lounge.